Welfare Units
Ascot: 01344 299 318
Milford: 01483 418 887
We are always looking to invest in the latest developments and sustainable solutions and our Welfare Units live up to these expectations. They have a variety of environmentally sensitive features, including PIR activated lighting that helps cut down on energy use and running costs.
The towable welfare units are fitted with table and bench seating, running hot water, heating system, microwave, kettle, stainless steel worktops, a sink, a drying room and toilet facilities.
Why hire from us?
- Up to 6 hours light without generator
- Up to 4 hours of hot water without generator
- 30 seconds quick setup & no nonsense hydraulic axles
For a comprehensive list of the environmentally friendly features and technical data of our Welfare Units, please download our Data Sheet.
Minimum hire duration is 28 days.